ELEC 3060 Wireless Design Laboratory
Spring 2009

Contact information:

Professor-  Dr. Roppel:   roppeth@auburn.edu
GTA for Tues., Thurs. sections:  Phil Walsh  paw0006.auburn.edu

Syllabus

Link to documentation---

  Browser friendly here

     or (includes supplemental material).....ftp://ftp.eng.auburn.edu/pub/roppeth/TIMS-Manuals/

Class meets in Shelby 2328:

Tues. 3:30 - 6:20  (Sect. 1)      GTA = Phil Walsh  paw0006.auburn.edu
Thurs. 3:30 - 6:20 (Sect. 2)      GTA = Phil Walsh  paw0006.auburn.edu

PROJECT REQUIREMENTS

Experiment Texts and Lab Report Outlines:
Agenda for Lab Experiments and Final Projects

Week (dates)

Experiment Text

Lab report outline

1 (Jan. 13, 15)

(1) Introduction to TIMS A1-01,
(2) Modeling an Equation A1-02

 doc file  html file

2 (Jan. 20, 22) 

(3) Amplitude modulation and envelopes  doc  pdf  

    doc     html

3 (Jan. 27, 29)

(4) Sampling   pdf
(5) Time Division Multiplexing  pdf

  doc    html

4 (Feb. 3, 5)

(6) Pseudo-Random Binary Sequence Generation  pdf
(7) Eye Patterns  pdf
Hardcopy will be provided in lab for these two experiments..

  doc
print out and bring to lab - one per team

xxxxxxxxxxxxxxx

No Labs - Career Fair is Thurs. Feb. 12

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx

5 (Feb. 17, 19)

(8) Noisy Channel Model  pdf  
Hardcopy will be provided in lab.

 doc 
Hardcopy will be provided in lab.

6 (Feb. 24, 26)

(9) Detection with the Decision Maker  pdf
Hardcopy will be provided in lab.

 doc 
Hardcopy will be provided in lab.

7 (Mar. 3, 5)

No labs - career fair

 

8 (Mar. 10, 12)

(10) Line Coding  pdf
(11) Amplitude Shift Keying (ASK)  pdf
(12) Binary Phase Shift Keying (BPSK)  pdf

Included in Experiment PDF's (previous column).
Hardcopy provided in lab

xxxxxxxxxxxxxxx

SPRING BREAK

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx

9 (Mar. 24, 26)

(13) Sample and Hold  doc
(14) Pulse Code Modulation (PCM) & Demodulation doc
NOTE: Project proposals are due next week in lab.

Included in Experiment write-ups (previous column).
Hardcopy provided in lab.

10 (Mar.31, Apr. 2)

Project proposals due in lab.
(15) Block Coding and Decoding   pdf
(16) Bit Error Rate Measurements in the Noisy Channel  doc

Hardcopy will be provided in lab.

11 (Apr. 7, 9)

Project proposals returned with comments.
(17) Bit Clock Regeneration  doc

Hardcopy will be provided in lab.

Apr. 21, 23

Project presentations given in lab.